dc.relation.references | Abend, J., The line between success and failure (1999) Bobbin, 40 (5), pp. 48-52;Allahverdi, A., Ng, C., Cheng, T., Kovalyov, M., A survey of scheduling problems with setup times or costs (2008) European Journal of Operational Research, 187 (3), pp. 985-1032;Andrejic, M., Bojovic, N., Kilibarda, M., A framework for measuring transport efficiency in distribution centers (2016) Transport Policy, 45 (1), pp. 99-106;Arango, M., Cano, J.A., Alvarez, K., Modelos de sistemas mrp cerrados integrando incertidumbre (2012) Revista EIA, 1 (18), pp. 61-76;Bonsignorio, F., Molfino, R., An object based virtual reality simulation tool for design validation of a new paradigmmanufacturing facility (2006) IFIP International Federation for Information Processin, 220, pp. 301-308;Buzacott, J., Modelling teams and workgroups in manufacturing (2004) Annals of Operations Research, 126 (1-4), pp. 215-230;Cano, J.A., Campo, E.A., Baena, J.J., Application of DEA in international market selection for the export of goods (2017) DYNA (Colombia), 84 (200), pp. 376-382;Cano, J.A., Gomez, R.A., Salazar, F., Routing policies in multi-parallel warehouses: an analysis of computing times (2017) Revista Espacios, 38 (51), p. 23. , http://www.revistaespacios.com/a17v38n51/17385123.html;Cano, J.A., Panizo, C.A., García, F.H., Rodríguez, J.E., Desarrollo de Estrategias Competitivas para la Industria del Carbón en Norte de Santander (2015) Revista Espacios, 36 (15), p. 5. , http://www.revistaespacios.com/a15v36n15/15361506.html;Cano, J.A., Panizo, C.A., García, F.H., Rodríguez, J.E., Estrategias para el mejoramiento la cadena de suministro del carbón en Norte de Santander, Colombia (2015) Boletín de Ciencias de la Tierra, 1 (38), pp. 65-74;Cano, J., Campo, E., Gómez-Montoya, R., International Market Selection Using Weighing and Monte Carlo Simulation (2017) Polish Journal of Management Studies, 16 (2), pp. 40-50;Cano, J., Campo, E., Gómez, R., Simulación de eventos discretos en la planificación de producción para sistemas de confección modular (2018) Revista Técnica de la Facultad de Ingeniería Universidad del Zulia, 41 (1), pp. 50-58;Gómez, R.A., Cano, J.A., Campo, E.A., Selección de proveedores en la minería de oro con lógica difusa (2016) Revista Venezolana de Gerencia (RVG), 21 (75), pp. 530-548;Gómez, R.A., Zuluaga, A., Cano, J.A., Utilización de simulación discreta como estrategia de aprendizaje de logística empresarial (2014) Revista Teckne, 12 (1), pp. 34-46;Hillier, F., Lieberman, G., (2010) Introducción a la Investigación de Operaciones, , México D.F.: McGraw-Hill;Ko, E., Quick response adoption process in the Korean apparel industr (2001) Journal of the Textile Institute Part 1: Fibre Science and Textile Technology, 92 (2), pp. 56-62;Mcnally, P., Heavey, C., Developing simulation as a desktop resource (2004) International Journal of Computer Integrated Manufacturing, 17 (5), pp. 435-450;Ramdass, K., Pretorius, L., Implementation of modular manufacturing in the clothing industry in Kwazulu-Natal: A case study (2011) South African Journal of Industrial Engineering, 22 (1), pp. 167-181;Rameshbabu, V., Garment production systems-An overview (2006) Textile Magazine, 47 (9), p. 22;Rojas, M., Guisao, E., Cano, J.A., (2011) Logística Integral: Una propuesta práctica para su negocio, , Medellín: Universidad de Medellín;Salazar, F., Gomez, R.A., Cano, J.A., El problema de carga de pallets en centros de distribución utilizando diseño de mezclas (2017) Revista Espacios, 38 (2), p. 2. , http://www.revistaespacios.com/a17v38n02/17380202.html;Sarache, W., Cespón, R., Ibarra, S., Alonso, P., Modular manufacturing: An alternative to improve the competitiveness in the clothing industry (2004) International Journal of Clothing Science and Technology, 16 (3-4), pp. 301-309;Wang, J., Schroer, B., Ziemke, M., Understanding modular manufacturing in the apparel industry using simulation (1991) Winter Simulation Conference Proceedings, pp. 441-447. , Phoenix, AZ, USA | spa |