dc.contributor.author | Cano J.A | |
dc.contributor.author | Gomez-Montoya R.A | |
dc.contributor.author | Cortes P | |
dc.contributor.author | Campo E.A. | |
dc.date.accessioned | 2022-09-14T14:33:54Z | |
dc.date.available | 2022-09-14T14:33:54Z | |
dc.date.created | 2021 | |
dc.identifier.issn | 17264529 | |
dc.identifier.uri | http://hdl.handle.net/11407/7517 | |
dc.description | This article aims to propose a fuzzy model for closed-loop material requirement planning (MRP) systems considering uncertain parameters like production capacity, on-hand inventory and lead times. For this, a deterministic closed-loop MRP model is proposed, and then fuzzy coefficients in the constraints of the model are used to establish the fuzzy MRP model, which depends on the degrees of satisfaction (λ) of the decision-maker. Data from a production plan of a company dedicated to the manufacture of electrical transformers are employed to verify the proposed fuzzy MRP model, minimizing inventory holding costs, production setup costs, and extra capacity costs. The results show the fuzzy model performs better than the deterministic model, especially for low λ values, providing better performance in terms of the total cost, total inventory, service level, and computational efficiency. © 2021, DAAAM International Vienna. All rights reserved. | eng |
dc.language.iso | eng | |
dc.publisher | DAAAM International Vienna | |
dc.relation.isversionof | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85105473258&doi=10.2507%2fIJSIMM20-1-538&partnerID=40&md5=063324274dcca69ff946e7402bb9586e | |
dc.source | International Journal of Simulation Modelling | |
dc.title | Mrp systems considering fuzzy capacity, lead times and inventory availability | |
dc.type | Article | |
dc.rights.accessrights | info:eu-repo/semantics/restrictedAccess | |
dc.publisher.program | Administración de Empresas | |
dc.type.spa | Artículo | |
dc.identifier.doi | 10.2507/IJSIMM20-1-538 | |
dc.subject.keyword | Fuzzy Logic | eng |
dc.subject.keyword | Inventory | eng |
dc.subject.keyword | Lead Time | eng |
dc.subject.keyword | MRP | eng |
dc.subject.keyword | Production Capacity | eng |
dc.relation.citationvolume | 20 | |
dc.relation.citationissue | 1 | |
dc.relation.citationstartpage | 29 | |
dc.relation.citationendpage | 39 | |
dc.publisher.faculty | Facultad de Ciencias Económicas y Administrativas | |
dc.affiliation | Cano, J.A., Universidad de Medellín, Carrera 87 # 30 – 65, Medellín, Colombia | |
dc.affiliation | Gomez-Montoya, R.A., Politécnico Colombiano Jaime Isaza Cadavid, Carrera 48 No. 7 – 151, Medellín, Colombia | |
dc.affiliation | Cortes, P., Escuela Técnica Superior de Ingeniería, Universidad de Sevilla, Camino de los Descubrimientos s/n, Sevilla, 41092, Spain | |
dc.affiliation | Campo, E.A., ESACS – Escuela Superior en Administración de Cadena de Suministro, Calle 4 # 18-55, Medellín, Colombia | |
dc.relation.references | Velasco Acosta, A.P., Mascle, C., Baptiste, P., Applicability of demand-driven MRP in a complex manufacturing environment (2020) International Journal of Production Research, 58 (14), pp. 4233-4245 | |
dc.relation.references | Öztürk, C., Örnek, A.M., A MIP based heuristic for capacitated MRP systems (2012) Computers & Industrial Engineering, 63 (4), pp. 926-942 | |
dc.relation.references | Wang, H., Gong, Q., Wang, S., Information processing structures and decision making delays in MRP and JIT (2017) International Journal of Production Economics, 188, pp. 41-49 | |
dc.relation.references | Sundharesalingam, P., Mohanasundari, M., Vidhyapriya, P., Application of productivity enhancement tools in RIGS manufacturing industry: ABC and MRP (2019) International Journal of Scientific & Technology Research, 8 (12), pp. 1900-1905 | |
dc.relation.references | Díaz-Madroñero, M., Mula, J., Jiménez, M., Peidro, D., A rolling horizon approach for material requirement planning under fuzzy lead times (2017) International Journal of Production Research, 55 (8), pp. 2197-2211 | |
dc.relation.references | Wiȩcek, D., Wiȩcek, D., Dulina, L., Materials requirement planning with the use of activity based costing (2020) Management Systems in Production Engineering, 28 (1), pp. 3-8 | |
dc.relation.references | Sutrisno, W., Airlangga, H.N.P., (2020) Analysis of Crude Oil Inventory Using the Material Requirement Planning Method, IOP Conference Series: Materials Science and Engineering, 722, p. 7 | |
dc.relation.references | Hencha, R., Verma, D.S., Study of material requirement planning processes & its analysis and implementation (A case study of automobile industry) (2019) International Journal of Scientific & Technology Research, 8 (8), pp. 648-653 | |
dc.relation.references | Hasanati, N., Permatasari, E., Nurhasanah, N., Hidayat, S., Implementation of material requirement planning (MRP) on raw material order planning system for garment industry (2019) IOP Conference Series: Materials Science and Engineering, 528. , Paper 012064, 8 pages | |
dc.relation.references | Milne, R.J., Mahapatra, S., Wang, C.-T., Optimizing planned lead times for enhancing performance of MRP systems (2015) International Journal of Production Economics, 167, pp. 220-231 | |
dc.relation.references | Du, T.C.T., Wolfe, P.M., Building an active material requirements planning system (2000) International Journal of Production Research, 38 (2), pp. 241-252 | |
dc.relation.references | Shofa, M.J., Moeis, A.O., Restiana, N., Effective production planning for purchased part under long lead time and uncertain demand: MRP vs demand-driven MRP (2018) IOP Conference Series: Materials Science and Engineering, 337, p. 7 | |
dc.relation.references | Kortabarria, A., Apaolaza, U., Lizarralde, A., Demand driven MRP – Nuevo método para la gestión de la cadena de suministro: Un estudio de caso (2019) Direccion Y Organizacion, 67, pp. 22-29 | |
dc.relation.references | Hong, P., Leffakis, Z.M., Managing demand variability and operational effectiveness: Case of lean improvement programmes and MRP planning integration (2017) Production Planning & Control, 28 (13), pp. 1066-1080 | |
dc.relation.references | Ho, C.-J., Evaluating the impact of operating environments on MRP system nervousness (1989) International Journal of Production Research, 27 (7), pp. 1115-1135 | |
dc.relation.references | Mula, J., Poler, R., Garcia-Sabater, J.P., Material requirement planning with fuzzy constraints and fuzzy coefficients (2007) Fuzzy Sets and Systems, 158 (7), pp. 783-793 | |
dc.relation.references | Mula, J., Poler, R., Garcia-Sabater, J.P., Capacity and material requirement planning modelling by comparing deterministic and fuzzy models (2008) International Journal of Production Research, 46 (20), pp. 5589-5606 | |
dc.relation.references | Díaz-Madroñero, M., Mula, J., Jiménez, M., Fuzzy goal programming for material requirements planning under uncertainty and integrity conditions (2014) International Journal of Production Research, 52 (23), pp. 6971-6988 | |
dc.relation.references | Wang, J.F., Fei, Z.C., Chang, Q., Fu, Y., Li, S.Q., Energy-saving operation of multistage stochastic manufacturing systems based on fuzzy logic (2019) International Journal of Simulation Modelling, 18 (1), pp. 138-149 | |
dc.relation.references | Uzun Araz, O., Eski, O., Araz, C., A reactive scheduling approach based on fuzzy inference for hybrid flowshop systems (2019) International Journal of Simulation Modelling, 18 (1), pp. 5-18 | |
dc.relation.references | Mula, J., Poler, R., Garcia, J.P., MRP with flexible constraints: A fuzzy mathematical programming approach (2006) Fuzzy Sets and Systems, 157 (1), pp. 74-97 | |
dc.relation.references | Shi, D.L., Zhang, B.B., Li, Y., A multi-objective flexible job-shop scheduling model based on fuzzy theory and immune genetic algorithm (2020) International Journal of Simulation Modelling, 19 (1), pp. 123-133 | |
dc.relation.references | Dolgui, A., Louly, A.O., Prodhon, C., A survey on supply planning under uncertainties in MRP environments (2005) IFAC Proceedings Volumes, 38 (1), pp. 1-12 | |
dc.relation.references | Noori, S., Feylizadeh, M.R., Bagherpour, M., Zorriassatine, F., Parkin, R.M., Optimization of material requirement planning by fuzzy multi-objective linear programming (2008) Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 222 (7), pp. 887-900 | |
dc.relation.references | Tavakoli-Moghaddam, R., Bagherpour, M., Noora, A.A., Sassani, F., Application of fuzzy lead time to a material requirement planning system (2007) Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, pp. 208-213 | |
dc.relation.references | Li, T., Lin, P., Sun, G.J., Liu, H.-H., Application of fuzzy programming with recourse in material requirement planning problem (2009) Proceedings of the 2009 International Conference on Measuring Technology and Mechatronics Automation, pp. 546-549 | |
dc.relation.references | Serna, M.D.A., Serna, C.A., Ortega, G.P., Parametric linear programming for a materials requirement planning problem solution with uncertainty (2010) Ingenieria E Investigacion, 30 (3), pp. 96-105 | |
dc.relation.references | Guillaume, R., Thierry, C., Grabot, B., MRP with imprecise demand and uncertain lead time (2011) Proceedings of the 7th Conference of the European Society for Fuzzy Logic and Technology, pp. 673-679 | |
dc.relation.references | Diaz-Madroñero, M., Mula, J., Jiménez, M., Material requirement planning under fuzzy lead times (2015) Ifac-Papers Online, 28 (3), pp. 242-247 | |
dc.relation.references | Ammar, O.B., Guillaume, R., Thierry, C., MRP parameter evaluation under fuzzy lead times (2016) Ifac-Papersonline, 49 (12), pp. 1110-1115 | |
dc.relation.references | Cano, J.A., Data World: Dataset Fuzzy MRP System, , https://data.world/joseale84/fuzzy-mrp-system | |
dc.type.coar | http://purl.org/coar/resource_type/c_6501 | |
dc.type.version | info:eu-repo/semantics/publishedVersion | |
dc.type.driver | info:eu-repo/semantics/article | |
dc.identifier.reponame | reponame:Repositorio Institucional Universidad de Medellín | |
dc.identifier.repourl | repourl:https://repository.udem.edu.co/ | |
dc.identifier.instname | instname:Universidad de Medellín | |