Mostrar el registro sencillo del ítem

dc.contributor.authorCano J.A
dc.contributor.authorGomez-Montoya R.A
dc.contributor.authorCortes P
dc.contributor.authorCampo E.A.
dc.date.accessioned2022-09-14T14:33:54Z
dc.date.available2022-09-14T14:33:54Z
dc.date.created2021
dc.identifier.issn17264529
dc.identifier.urihttp://hdl.handle.net/11407/7517
dc.descriptionThis article aims to propose a fuzzy model for closed-loop material requirement planning (MRP) systems considering uncertain parameters like production capacity, on-hand inventory and lead times. For this, a deterministic closed-loop MRP model is proposed, and then fuzzy coefficients in the constraints of the model are used to establish the fuzzy MRP model, which depends on the degrees of satisfaction (λ) of the decision-maker. Data from a production plan of a company dedicated to the manufacture of electrical transformers are employed to verify the proposed fuzzy MRP model, minimizing inventory holding costs, production setup costs, and extra capacity costs. The results show the fuzzy model performs better than the deterministic model, especially for low λ values, providing better performance in terms of the total cost, total inventory, service level, and computational efficiency. © 2021, DAAAM International Vienna. All rights reserved.eng
dc.language.isoeng
dc.publisherDAAAM International Vienna
dc.relation.isversionofhttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85105473258&doi=10.2507%2fIJSIMM20-1-538&partnerID=40&md5=063324274dcca69ff946e7402bb9586e
dc.sourceInternational Journal of Simulation Modelling
dc.titleMrp systems considering fuzzy capacity, lead times and inventory availability
dc.typeArticle
dc.rights.accessrightsinfo:eu-repo/semantics/restrictedAccess
dc.publisher.programAdministración de Empresas
dc.type.spaArtículo
dc.identifier.doi10.2507/IJSIMM20-1-538
dc.subject.keywordFuzzy Logiceng
dc.subject.keywordInventoryeng
dc.subject.keywordLead Timeeng
dc.subject.keywordMRPeng
dc.subject.keywordProduction Capacityeng
dc.relation.citationvolume20
dc.relation.citationissue1
dc.relation.citationstartpage29
dc.relation.citationendpage39
dc.publisher.facultyFacultad de Ciencias Económicas y Administrativas
dc.affiliationCano, J.A., Universidad de Medellín, Carrera 87 # 30 – 65, Medellín, Colombia
dc.affiliationGomez-Montoya, R.A., Politécnico Colombiano Jaime Isaza Cadavid, Carrera 48 No. 7 – 151, Medellín, Colombia
dc.affiliationCortes, P., Escuela Técnica Superior de Ingeniería, Universidad de Sevilla, Camino de los Descubrimientos s/n, Sevilla, 41092, Spain
dc.affiliationCampo, E.A., ESACS – Escuela Superior en Administración de Cadena de Suministro, Calle 4 # 18-55, Medellín, Colombia
dc.relation.referencesVelasco Acosta, A.P., Mascle, C., Baptiste, P., Applicability of demand-driven MRP in a complex manufacturing environment (2020) International Journal of Production Research, 58 (14), pp. 4233-4245
dc.relation.referencesÖztürk, C., Örnek, A.M., A MIP based heuristic for capacitated MRP systems (2012) Computers & Industrial Engineering, 63 (4), pp. 926-942
dc.relation.referencesWang, H., Gong, Q., Wang, S., Information processing structures and decision making delays in MRP and JIT (2017) International Journal of Production Economics, 188, pp. 41-49
dc.relation.referencesSundharesalingam, P., Mohanasundari, M., Vidhyapriya, P., Application of productivity enhancement tools in RIGS manufacturing industry: ABC and MRP (2019) International Journal of Scientific & Technology Research, 8 (12), pp. 1900-1905
dc.relation.referencesDíaz-Madroñero, M., Mula, J., Jiménez, M., Peidro, D., A rolling horizon approach for material requirement planning under fuzzy lead times (2017) International Journal of Production Research, 55 (8), pp. 2197-2211
dc.relation.referencesWiȩcek, D., Wiȩcek, D., Dulina, L., Materials requirement planning with the use of activity based costing (2020) Management Systems in Production Engineering, 28 (1), pp. 3-8
dc.relation.referencesSutrisno, W., Airlangga, H.N.P., (2020) Analysis of Crude Oil Inventory Using the Material Requirement Planning Method, IOP Conference Series: Materials Science and Engineering, 722, p. 7
dc.relation.referencesHencha, R., Verma, D.S., Study of material requirement planning processes & its analysis and implementation (A case study of automobile industry) (2019) International Journal of Scientific & Technology Research, 8 (8), pp. 648-653
dc.relation.referencesHasanati, N., Permatasari, E., Nurhasanah, N., Hidayat, S., Implementation of material requirement planning (MRP) on raw material order planning system for garment industry (2019) IOP Conference Series: Materials Science and Engineering, 528. , Paper 012064, 8 pages
dc.relation.referencesMilne, R.J., Mahapatra, S., Wang, C.-T., Optimizing planned lead times for enhancing performance of MRP systems (2015) International Journal of Production Economics, 167, pp. 220-231
dc.relation.referencesDu, T.C.T., Wolfe, P.M., Building an active material requirements planning system (2000) International Journal of Production Research, 38 (2), pp. 241-252
dc.relation.referencesShofa, M.J., Moeis, A.O., Restiana, N., Effective production planning for purchased part under long lead time and uncertain demand: MRP vs demand-driven MRP (2018) IOP Conference Series: Materials Science and Engineering, 337, p. 7
dc.relation.referencesKortabarria, A., Apaolaza, U., Lizarralde, A., Demand driven MRP – Nuevo método para la gestión de la cadena de suministro: Un estudio de caso (2019) Direccion Y Organizacion, 67, pp. 22-29
dc.relation.referencesHong, P., Leffakis, Z.M., Managing demand variability and operational effectiveness: Case of lean improvement programmes and MRP planning integration (2017) Production Planning & Control, 28 (13), pp. 1066-1080
dc.relation.referencesHo, C.-J., Evaluating the impact of operating environments on MRP system nervousness (1989) International Journal of Production Research, 27 (7), pp. 1115-1135
dc.relation.referencesMula, J., Poler, R., Garcia-Sabater, J.P., Material requirement planning with fuzzy constraints and fuzzy coefficients (2007) Fuzzy Sets and Systems, 158 (7), pp. 783-793
dc.relation.referencesMula, J., Poler, R., Garcia-Sabater, J.P., Capacity and material requirement planning modelling by comparing deterministic and fuzzy models (2008) International Journal of Production Research, 46 (20), pp. 5589-5606
dc.relation.referencesDíaz-Madroñero, M., Mula, J., Jiménez, M., Fuzzy goal programming for material requirements planning under uncertainty and integrity conditions (2014) International Journal of Production Research, 52 (23), pp. 6971-6988
dc.relation.referencesWang, J.F., Fei, Z.C., Chang, Q., Fu, Y., Li, S.Q., Energy-saving operation of multistage stochastic manufacturing systems based on fuzzy logic (2019) International Journal of Simulation Modelling, 18 (1), pp. 138-149
dc.relation.referencesUzun Araz, O., Eski, O., Araz, C., A reactive scheduling approach based on fuzzy inference for hybrid flowshop systems (2019) International Journal of Simulation Modelling, 18 (1), pp. 5-18
dc.relation.referencesMula, J., Poler, R., Garcia, J.P., MRP with flexible constraints: A fuzzy mathematical programming approach (2006) Fuzzy Sets and Systems, 157 (1), pp. 74-97
dc.relation.referencesShi, D.L., Zhang, B.B., Li, Y., A multi-objective flexible job-shop scheduling model based on fuzzy theory and immune genetic algorithm (2020) International Journal of Simulation Modelling, 19 (1), pp. 123-133
dc.relation.referencesDolgui, A., Louly, A.O., Prodhon, C., A survey on supply planning under uncertainties in MRP environments (2005) IFAC Proceedings Volumes, 38 (1), pp. 1-12
dc.relation.referencesNoori, S., Feylizadeh, M.R., Bagherpour, M., Zorriassatine, F., Parkin, R.M., Optimization of material requirement planning by fuzzy multi-objective linear programming (2008) Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 222 (7), pp. 887-900
dc.relation.referencesTavakoli-Moghaddam, R., Bagherpour, M., Noora, A.A., Sassani, F., Application of fuzzy lead time to a material requirement planning system (2007) Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, pp. 208-213
dc.relation.referencesLi, T., Lin, P., Sun, G.J., Liu, H.-H., Application of fuzzy programming with recourse in material requirement planning problem (2009) Proceedings of the 2009 International Conference on Measuring Technology and Mechatronics Automation, pp. 546-549
dc.relation.referencesSerna, M.D.A., Serna, C.A., Ortega, G.P., Parametric linear programming for a materials requirement planning problem solution with uncertainty (2010) Ingenieria E Investigacion, 30 (3), pp. 96-105
dc.relation.referencesGuillaume, R., Thierry, C., Grabot, B., MRP with imprecise demand and uncertain lead time (2011) Proceedings of the 7th Conference of the European Society for Fuzzy Logic and Technology, pp. 673-679
dc.relation.referencesDiaz-Madroñero, M., Mula, J., Jiménez, M., Material requirement planning under fuzzy lead times (2015) Ifac-Papers Online, 28 (3), pp. 242-247
dc.relation.referencesAmmar, O.B., Guillaume, R., Thierry, C., MRP parameter evaluation under fuzzy lead times (2016) Ifac-Papersonline, 49 (12), pp. 1110-1115
dc.relation.referencesCano, J.A., Data World: Dataset Fuzzy MRP System, , https://data.world/joseale84/fuzzy-mrp-system
dc.type.coarhttp://purl.org/coar/resource_type/c_6501
dc.type.versioninfo:eu-repo/semantics/publishedVersion
dc.type.driverinfo:eu-repo/semantics/article
dc.identifier.reponamereponame:Repositorio Institucional Universidad de Medellín
dc.identifier.repourlrepourl:https://repository.udem.edu.co/
dc.identifier.instnameinstname:Universidad de Medellín


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem